Between 2002-2009, Dorce Prefabricated Bulding and Construction completed American military base projects in different fields of Iraq under harsh conditions, where speed, organization and engineering skills are required. The project was realized by using Modular Container Units and Modular Prefabricated Steel Building systems. Within the scope of the project; Dorce Prefabricated undertook field, ground and foundation works, concrete works, site roads, vehicle parking areas, landscaping works, playgrounds, security fences, electrical and mechanical installation works, fire detection, alarm, control, including engineering, superstructure and infrastructure works, Protection systems, shelters, generators, drinking water and waste water treatment systems, furniture, equipment, testing and commissioning works. All freight operations of the project were carried out by air transport.

Dorce Prefabricated is the Leading Manufacturer of Aircraft and Helicopter Hangar Projects in the Prefabricated Heavy Steel sector. The design and construction works of F-16 hangar & F-35 hangar located in Djibouti, were undertaken for the Japanese army. Such top-level projects are completed with heavy steel structure systems.
The design and construction works of the project were completely carried out by Dorce Prefabricated; Testing and commissioning activities were also completed within the scope of engineering and superstructure works.

  • PAÍSES TERMINAMOS O PROJETO

  • NOSSOS PROJETOS