Dorce Prefabricated Building & Construction Inc. took its place in the 2nd SAHA EXPO Defense, Aviation and Space Industry Fair.

2023-06-20T14:31:00+03:00

Dorce Prefabricated Building & Construction Inc. took its place in the 2nd SAHA EXPO Defense, Aviation and Space Industry Fair. Dorce Prefabricated Construction & Buildings will host its visitors at Hall 7 / Stand 7E-15 within the scope of the 2nd SAHA EXPO Defense Fair, which will be held in Istanbul between 10-13 November 2021. DORCE is at the center of the Turkish defense industry, as it is located in Ankara. The company has built a reputation for its projects completed in more than 60 countries on 6 continents. The prefabricated modular steel structures are designed, manufactured, and built more..

Dorce Prefabricated Building & Construction Inc. took its place in the 2nd SAHA EXPO Defense, Aviation and Space Industry Fair.2023-06-20T14:31:00+03:00

New trend: “Volumetric Modular Construction”

2022-03-22T09:28:38+03:00

New trend: “Volumetric Modular Construction” Volumetric modular construction is a process of off-site manufacturing of volumetric modules in a controlled environment at the industrialized facility (factory conditions) and assembly of these modules in order to create the main structure. Are Volumetric Construction and Modular Construction different from each other? Volumetric structures are a type of modular construction. Fundamentally, volumetric structures are modular structures in respect of manufacturing process; but nevertheless, all modular structures are not considered volumetric. Modular construction is the assembly of one or more components manufactured off-site. They have a wide variety of uses in numerous sectors more..

New trend: “Volumetric Modular Construction”2022-03-22T09:28:38+03:00

Dorce Inc. and Pre – Engineered Emergency Accommodation Shelters After Earthquake in Van

2021-08-26T15:01:00+03:00

Dorce Inc. and Pre – Engineered Emergency Accommodation Shelters After Earthquake in Van Emergency accommodation units have been a solution for the sheltering problem after the Earthquake which killed so many people and caused huge damages in Van. Dorce Inc. produced 3000 emergency accommodation shelters, 100 containers per a day, in 45 days in order to solve the sheltering problem of the earthquake victims. Dorce has proven its strategies against the crises successfully through its vast production capacity. The significant features of the emergency accommodation shelters produced by Dorce Inc. are fast production, easily transportable and assembly. Hard steel design more..

Dorce Inc. and Pre – Engineered Emergency Accommodation Shelters After Earthquake in Van2021-08-26T15:01:00+03:00

The Prime Minister of Moldova Called Dorce Prefabricated Building Inc. to Invest in Moldova 

2021-08-26T15:01:58+03:00

The Prime Minister of Moldova Called Dorce Prefabricated Building Inc. to Invest in Moldova  Prime Minister of Moldova Mr. Vladimir FILAT has visited the production facilities of Dorce Prefabricated Building Inc., during his official visit of our country with the purpose of increasing the trade volume between Turkey and Moldova. Mr. Vladimir FILAT, Prime Minister of Moldova, who paid an official visit to Turkey on the date of November 1, 2012, has visited the production facilities of Dorçe Prefabricated Building Inc., after consultation with Mr. Prime Minister Recep Tayyip ERDOGAN and with Mr. President Abdullah GUL. Mr. Vladimir FILAT, more..

The Prime Minister of Moldova Called Dorce Prefabricated Building Inc. to Invest in Moldova 2021-08-26T15:01:58+03:00

2011 Export Award to the DORCE Prefabricated Building and Construction Inc.

2021-08-26T15:02:51+03:00

2011 Export Award to the DORCE Prefabricated Building and Construction Inc. The exporting power of Dorce Prefabricated Building and Construction Inc., which is one of the pioneers of export in Turkey, was proved once again. Dorce was deemed worthy to the Highest Export Volume Award of the year 2011 by taking place in most export-oriented  25 companies between registered organizations of the Ankara Chamber of Industry in the 49th year Ceremony organized by the Ankara Chamber of Industry on December 27, 2012. Dorce Prefabricated Building and Construction Inc. was deemed worthy to the Highest Export Volume Award of the year more..

2011 Export Award to the DORCE Prefabricated Building and Construction Inc.2021-08-26T15:02:51+03:00

Dorce received the award for 10,000,000 man / hour work without accidents for its project at Tasiast in Mauritania

2021-08-26T15:12:40+03:00

Dorce received the award for 10,000,000 man / hour work without accidents for its project at Tasiast in Mauritania Dorce Prefabricated Building & Construction Industry Trade Inc. has completed its draft 8,400 people Tasiast Life Base in Mauritania whilst respecting the program and without accidents. Under the project, despite the harsh conditions of the region and the climate, thanks to its organized and disciplined work, Dorce was awarded the prize for 10,000,000 man / hour work without accidents. Dorce prevents work accidents by providing work health and safety training, equipment and orientation to its employees. Worker health and safety specialists more..

Dorce received the award for 10,000,000 man / hour work without accidents for its project at Tasiast in Mauritania2021-08-26T15:12:40+03:00

The World’s Largest Oil Exporter Saudi Arabia’s Public Oil Company Saudi Aramco and Dorce INC. Signed A Memorandum of Understanding

2021-08-26T15:16:46+03:00

The World’s Largest Oil Exporter Saudi Arabia’s Public Oil Company Saudi Aramco and Dorce INC. Signed A Memorandum of Understanding Within the scope of the 23rd World Energy Summit held in İstanbul, Saudi Arabia’s public oil company Saudi Aramco and our company signed a memorandum of understanding on October 11, 2016. On behalf of our company, our general manager, Reşat Doruk COŞKUNSU  signed the memorandum of understanding. This memorandum of understanding will enable Dorce to participate in tenders of Saudi Aramco’s various projects. In this context, on the projects that Saudi Aramco plans to invest more than 300 billion in next more..

The World’s Largest Oil Exporter Saudi Arabia’s Public Oil Company Saudi Aramco and Dorce INC. Signed A Memorandum of Understanding2021-08-26T15:16:46+03:00

Dorce Inc. has been Ranked at 129th on the Istanbul Chamber of Industry “Türkiye’s Second Top 500 Industrial Enterprises 2016“ List

2024-06-28T17:33:04+03:00

Dorce Inc. has been Ranked at 129th on the Istanbul Chamber of Industry “Türkiye’s Second Top 500 Industrial Enterprises 2016“ List Dorce Inc. has been ranked at 129th on the İstanbul Chamber of Industry “Türkiye’s Second Top 500 Industrial Enterprises 2016“ list, published on 19th of July, 2017. http://www.iso500.org.tr/ikinci-500-buyuk-sanayi-kurulusu/2016/

Dorce Inc. has been Ranked at 129th on the Istanbul Chamber of Industry “Türkiye’s Second Top 500 Industrial Enterprises 2016“ List2024-06-28T17:33:04+03:00

The President Of The Republic Of Gabon Has Visited The Production Facilities Of Dorce Prefabricated Building During His Visit Of Türkiye

2024-06-28T17:33:34+03:00

The President Of The Republic Of Gabon Has Visited The Production Facilities Of Dorce Prefabricated Building During His Visit Of Türkiye The President of the Republic of Gabon, Mr. Ali Bongo Ondimba has visited the production facilities of Dorçe Prefabricated Building Inc., during his official visit of our country with the purpose of increasing the trade volume between Türkiye and Gabon. Mr. Ali Bongo Ondimba, The President of the Republic of Gabon, who paid an official visit to Türkiye as an official guest of Turkish Confederation of Businessmen and Industrialists (TUSKON) on the date of July 19, 2012, has visited the more..

The President Of The Republic Of Gabon Has Visited The Production Facilities Of Dorce Prefabricated Building During His Visit Of Türkiye2024-06-28T17:33:34+03:00

DorceKazak. has been awarded for 1,000,000 safe man-hours without a lost time injury during the construction of “Shanyrak Village Rotational Camp Construction” Project in Kazakhstan, Tengiz

2021-08-26T15:24:44+03:00

DorceKazak. has been awarded for 1,000,000 safe man-hours without a lost time injury during the construction of “Shanyrak Village Rotational Camp Construction” Project in Kazakhstan, Tengiz DorceKazak. has been awarded for 1,000,000 safe man-hours without a lost time injury during the construction of “Shanyrak Village Rotational Camp Construction” Project in Kazakhstan, Tengiz.  Despite the climatic and challenging working and site conditions of 4,000 Man Shanyrak ‘Birlik’ Village camp construction project; DorceKazak team the subsidiary of Dorce Turkey Inc. succeeded ito be organized, disciplined and were wawre of the safety and and aware of its responsibility to ensure the HSE regulations on site. DorceKazak prevents more..

DorceKazak. has been awarded for 1,000,000 safe man-hours without a lost time injury during the construction of “Shanyrak Village Rotational Camp Construction” Project in Kazakhstan, Tengiz2021-08-26T15:24:44+03:00
Go to Top